Welcome to the Excavation
Site . . .![]()
Hold on to your hats ! - Books N. Moore
![]()
This is the sign posted out front on the lot. It gives you all the contractor specs.

The Hallmark Construction site trailer,
where some of the "bizness" is taken care of.
(yes, the blue thing on the left is the porta-potty)

Let the Excavation Begin
Hold on to your hats. It's earthmoving time . . .
* It
starts out R-E-A-L S-L-O-W.* 
But it begins to take shape VERY FAST.
*
*

The pipelines for the sewer system.
*

This is the re-rod in the pad for the main elevator. It's HUGE!
Look at the size of those people!!

It took 19 truck loads of cement to fill the elevator pad.
Each truck holds about 14 yards of concrete.
*
*

Drainage Pipes (these are 3 ft. in diameter - incredible!)

Laying the drainage pipes, underground, beneath the parking lot.
*
*

*
*
*
*
![]()
**
Where to next?
EXCAVATION SITE // FOUNDATION
SITE // STEEL SITE
ENCLOSURE SITE // EXTERNAL FINISHES
SITE // INTERNAL FRAMING SITE
INSIDE WORK SITE // INTERIOR DECOR
SITE
THE BIG MOVE // GALA / DEDICATION
SITE
FUN FACTS - DIDJA KNOW?![]()
[ Welcome ] [ Policies
& Special Services ] [ Card Catalog ]
[ LBPH ]
[ Library Departments ] [ Branch
& Member Libraries ]
[ Law Library ] [ Friends
of TADL ] [ Local Interest ]
[ HOME ]
©2001 Traverse Area
District Library |
This system operates under the
conditions set forth in the Traverse Community Network Acceptable Use Policy. |
Last Modified: 01/31/03 by Webster